Lewis Deck to Bellwood Park, Perth

We were asked to initially advise on potential solutions for creating an underfloor heating system to the upper floor of the property at Bellwood Park. As it was in a remote location and off the grid for mains gas the house was to be heated by a heat pump and so efficiency was a major consideration on the project.

Lewis Deck, working with Gyvlons anhydrite screeds, is able to work more efficiently than most other upper floor systems on the market as the thin screed and steel deck work in conjunction with each other to emit more heat from the floor and faster. Because of this the heat pump was able to heat the floor using less energy than with other systems and so was ideal for this project.

Timber Framed House in Scotland with Underfloor heating upstairs using the Lewis Deck system
Timber Framed House in Scotland with Underfloor heating upstairs using the Lewis Deck system

The Lewis Deck was laid in less than two days, the underfloor heating pipes were put down in 2 days just ahead of the screed pour – using a clip rail system and Lewis pipe clips. The screed was poured in one day and ready to walk on within 48 hours. So the whole system was installed and ready for the next stage of works in less than 7 days.

 

Chat Live

Hi you're speaking to Dave, how can I help.

Website by Indigo

Case Studies – CDI